This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2008 - Classification Unit 721009:
Concrete Cutting or Coring

Sector: Construction
Subsector: General Construction
Rate group: FX
Industry group: FX04 - General Construction
Base rate 2008: $4.77 per $100 of assessable payroll, to a maximum wage per worker of $66,500
Previous rates:  
              2007: $4.80 (maximum wage per worker: $64,400)
              2006: $6.00 (maximum wage per worker: $62,400)

This classification unit is new to this group. View the 2007 information for this classification unit.

Try another search.

Get Acrobat Reader To view PDF documents you must have Adobe Acrobat Reader installed on your system. To obtain a copy of the free reader visit the Adobe web site.